205 East 22nd Street
 
        
        
      
           
        
        
      
           
        
        
      
           
        
        
      
           
        
        
      
           
        
        
      
           
        
        
      
           
        
        
      
           
        
        
      
    the materials involved include the following:
- drop ceiling: faced with stainless steel.
- lighting: four (4) l.e.d down light system.
- upper panels: faced with wood veneer. all the panels are running horizontally & held in place with aluminum z-clips.
- lower panels: faced with architectural rimex metal. all the panels are held in place with aluminum z-clips.
- handrails: one (1) faced with rimex gold suede.
- frieze & fronts: faced with stainless steel.
- reveals & base: faced with rimex gold suede.
- floor: faced with black rubber stainless steel studded tile flooring.
